Summer Readiness Generator

Camp needs to be able to operate through the inevitable PG&E outages. Our big generator had an engine failure last year. The cost of replacing the engine is prohibitive. This project requires pulling the engine from the generator and replacing it. New motor should be available by May 1.

Service manual can be found here