Summer Readiness Amphitheater

Our very popular music series, Concert for a Cause, and our summer camp performing artist programs rely on our very cool amphitheater.

Phase 1: The winter of ’23 was not not kind to our seating terraces.

Skills: Basic Landscaping Tools

Team: 2-4 landscapers

Tools: Shovels, Rakes, Roller

Materials: Gravel

  • Replenish “DG” (decomposed granite) or road base.
  • Grade each level to remove effects of erosion
  • Compact each terrace with roller
  • Repair accessible routes re pave with road base for better compaction
  • Pull back turf relevel DG
  • Replace Turf

Phase 2 : Upgrade stage wiring

Team: 1-2 with basic electrical skills

Skills: Light Carpentry, Electrical

Tools: 8 ft 2×4, Saws, Screw Guns, Wire strippers, Crimpers

Materials: Stage boxes, Wire

  • Install new connection boxes (Cut holes in deck and secure to floor joists)
  • Connect Audio Cables
  • Connect 110v Outlets

Phase 3 : Pour Concrete entry to stage and terraces

  • Regrade ramp
  • Install culvert
  • Build forms
  • Pour and finish concrete
  • Remove forms and finish grade